How Long Does It Take to Build a Pool with Professional Pool Builders?

Brisbane pool builders

Building a swimming pool is among the most fulfilling modifications to one’s house, especially in Brisbane. Before approaching a pool builder and building the pool, the homeowner must consider the essential things, such as the time it would take, among other things. 

The construction time taken to make a swimming pool is usually determined to be 6 to 12 weeks, but many factors can affect this. This blog provides detailed insights into the timelines that Brisbane pool builders provide for constructing a swimming pool, assisting you in planning your project effectively.

  1. Initial Design and Planning (1–3 weeks)

Design and planning are critical to any project, and for a pool, this begins in the first stage. Working with your builder helps you decide on the pool’s style, material, shape, size, lighting, and heating. Key elements encompass the distance for the pool, outside size, and panorama design, all of which need to meet Brisbane City Council policies. 

After finalising the design, your builder will proceed with permits, a process taking roughly 1 to 3 weeks. It’s crucial to note that Brisbane has stringent regulations regarding pool fencing and safety barriers.

  1. Site Preparation and Excavation (1–2 weeks)

The next stage involves site preparation and excavation. Pool builders will outline the area and prepare for digging, varying excavation time based on pool size, soil type, and backyard access. In densely populated areas of Brisbane, limited access may cause delays if trees or structures need removal. 

After marking the site, excavation typically takes one to two weeks, depending on weather, soil conditions, and potential underground utility lines.

  1. Pool Shell Construction (2–4 weeks)

Next, the pool shell is constructed, with timelines depending on whether you choose concrete or fibreglass. Concrete pools, built on-site and highly customisable, can take two to four weeks due to the steel framework and curing process. 

In contrast, fibreglass pools are pre-manufactured and usually installed within one to two weeks, requiring precise site preparation. Brisbane’s hot weather can affect concrete curing, so including this in your timeline is essential. Close coordination with your builder is crucial during this phase.

  1. Plumbing, Electrical, and Tiling (2–3 weeks)

Once the pool shell is in place, plumbing and electrical systems are installed for filtration, lighting, pumps, and heating. Afterwards, the pool’s interior finish, such as tiling, rendering, or a vinyl liner, is applied. Pebble concrete or tile finishes are standard for concrete pools, and this process usually takes 2 to 3 weeks. 

It could take longer if you’ve chosen detailed tile work or custom finishes. Installing features like heating, fountains, or spa jets may extend the timeline by a week or more.

  1. Landscaping and Final Touches (1–2 weeks)

The pool construction requires establishing a structure and systems, and then attention is directed to other aspects like the decks, pathways, fences, and other outdoor accessories. For instance, it is crucial to fence pools in Brisbane for security reasons, and your construction contractor will help you with the same, although you can have appealing designs.

On average, landscaping, regardless of how complex, takes one to two weeks, while some intricate models can take additional time. In this stage, a few touches are also made to the filtration and heating system to check and ensure all the systems are in order before the pool is filled with water.

Factors That Can Affect the Pool Construction Timeline

While the general timeline for building a pool in Brisbane is 6 to 12 weeks, numerous elements can affect how quickly or slowly your task progresses:

  • Weather Delays: Brisbane has subtropical weather, which is absolutely for a rainy season that may prevent construction. Heavy rain can slow excavation and other stages, particularly in the early phases.
  • Customisations: If you’ve opted for a highly customised design, such as infinity edges, waterfalls, or bespoke tile work, this can add to the construction timeline. Consequently, the more elaborate and compound the style of your pool, the longer it will take to construct.
  • Site Conditions: Sloped land, complicated soil conditions, and any conditions that will make it difficult for construction equipment to reach the site may affect the excavation and preparation period.
  • Materials Availability: Occasionally, supply chain delays can affect the availability of certain materials, especially for customised finishes or imported tiles. It’s wise to check with your pool builder about potential delays.
  • Permit Approvals: While permit approval in Brisbane generally takes 1 to 3 weeks, delays can occur if additional documentation or revisions are needed.

Final Thoughts

Brisbane swimming pool construction is usually completed in 6 to 12 weeks; however, other elements, which include additional structure that has to be incorporated into the fundamentals of construction, could take much longer time, as the preparation time for the site and challenging weathers such as rainy seasons causing delay on water works. Consequently, one must find a competent pool builder and properly design the project to minimise such an inconvenience.

Professional swimming pool builders in Brisbane prioritise keeping customers informed about every construction phase, from design to building to landscaping, to prevent project abandonment and allow the owner to enjoy their new swimming pool promptly.